This is an unaffiliated request

New pavement not complete. تم حفظه في الأرشيف

2719-2723 Brittni Dayle Dr Charlotte, NC 28214, USA عرض على الخريطة إخفاء الخريطة
تحريك علامة لتمثيل موقع القضية الخاص بك. سوف عنوان لا يتغير.

مراسل صحفي

(ضيف)

ID قضية:

155502

Submitted To:

الجماعة

فئة:

لا يوجد

شاهدوا:

409 مرات

ذكرت عبر:

http://www.wbtv.com

ذكرت:

في

الوصف

There was work done in my neighborhood the summer of 2011. This work included removing a section of the road and then repaving the road. The end result left a paved road that is very uneven and incomplete as the paving company only paved half of the road. The same problem exist on Isaac Hunter Dr, and Emily Hope Dr. I am not sure if this work is on hold due to lack of funding for the project, I really hope so as this would be better than knowing that the D.O.T. considers these roads complete. I am afraid that this will ultimately lower home values in this development and contribute to a failed road system if left incomplete. Any help would be greatly appreciated.


1 تعليق

التعليقات مغلقة لقضايا المؤرشفة.